EcoDomus CDE for Linear Infrastructure

EcoDomus CDE is being implemented for the largest transport infrastructure project ever to be undertaken in New Zealand: City Rail Link (CRL).


The CRL is a 3.45km twin-tunnel underground rail link up to 42 metres below the city centre transforming the downtown Britomart Transport Centre into a two-way through-station that better connects the Auckland rail network. The CRL is due for completion in 2024. The revised cost envelope for completing the entire Auckland City Rail Link project now totals $4.419 billion.

EcoDomus CDE will be used for document management, BIM data collection and Quality Control, issues management, and other construction processes.